Case Study - Flintshire
Job Brief
Test existing fuel for contamination. Decommission existing below ground tank and make safe. Provide new concrete base for new above ground diesel tank complete with collision barriers. Provide new 25,000 litre above ground bunded diesel tank complete with dispensing pump and fuel monitoring system.
Project Details
After testing the fuel in the below ground tank was found to be contaminated beyond redemption, consequently they were decommissioned and rendered inert.
A new concrete base was constructed complete with collision barriers positioned so as to assist traffic flow. A new 25,000 litre integrally bunded above ground diesel tank was installed together with dispensing pump and fuel monitoring system.
Working closely with McFaddens civils contractors and Triscan FM systems Ledbury Welding & Engineering delivered the project within a 4 week time frame.