Design Brief

The safe above ground storage of 300,000 litres of petrol and diesel for new filling station.

 Minimise environmental risk with secondary contained above ground steel tanks.

Documented safety history eliminating risks to the general public.

Project Details

New filling station for Biggleswade Superstore

  • 3 x 75,000 litres Supervaults for petrol storage
  • 1 x 75,000 litres Supervault twin compartment (petrol/diesel) storage
  • Access stairs and walkways to all 4 tanks

Burying tanks to store petrol and diesel is becoming less acceptable due to the very real risk of soil contamination and groundwater pollution. The Supervault manufactured in the UK under license by Ledbury Welding & Engineering offers the ideal solution. The much reduced civils works and shorter installation time, made the Supervault  a major contributing factor in this project which took only six months to complete.