Welcome to Ledbury Welding & EngineeringWelcome to Ledbury Welding & EngineeringWelcome to Ledbury Welding & Engineering
Home
About Us
Products
Services
Case Studies
News
SHG
Contact Us
 
 


Ledbury Welding & Engineering Ltd
New Mills Industrial Estate,
Leadon Way,
Ledbury,
Herefordshire,
HR8 2SR


 
Products
Derv Pack
Economy Tanks
Industrial Tanks
Super Vaults
Cylindrical Products
     
  Case Studies
 

Case Study - ACC West Thurrock

Please click an image to enlarge

ACC – West Thurrock  ACC – West Thurrock  ACC – West Thurrock  ACC – West Thurrock

Job Brief

Design & Provide Facility for both Derv for Road Vehicles & Gas Oil for Site Vehicles & Temperature Controlled Trailers
136,000 Litres Self Bunded Tank – Twin Compartment Split 110,000 Litres Derv / 26,000 Litres Gas Oil
Limit Site Space for Self Bunded Tank
Fuel Island for 6 fuelling points onto existing layout with limited space (4 No Single Sided & 2 No Double Sided)
All dispensed products to be monitored
Pipework must run below ground
Feed Pipework to be Double walled Durapipe

Project Details

Ledbury Welding & Engineering were approached by ACC Distribution with the above requirements to assist them in their new build project at West Thurrock. During this project we work closely with ACC, Merridale (Pump Equipment Supplier) and many sub contractors to ensure that the new build would be a success. The project from start to finish took 2-3 months.

Case Study - SuperVault

ACC – West Thurrock ACC – West Thurrock ACC – West Thurrock

Days Contract Hire & Rental - Swansea  

Design Brief

Above ground unit built strictly in accordance with current regulations
Environmentally preferable, minimising pollution risk
Minimum installation work, re-locatable & long life 

Project Details

15,000 litres twin compartment Supervault MH (7,500/7,500 petrol/diesel)
Free standing pump security cabinet housing two Pumptronics twin pumps each with dispense/debowse capability.
Ledbury Welding & Engineering were contacted by Days Contract Hire & Rentals (Swansea) Their General Manager Mike McCarry had some time ago identified a need for an on site petrol/diesel storage, but was loathe to undergo the upheaval and expense of civils works which accompanies the traditional below ground installation. The Supervault was clearly the solution. Requiring only a concrete base, once off-loaded simple pipe-work connections and power hook up to the pumps and the unit was operational the following day. Ledbury Welding & Engineering made provision on the pump cabinet for a fuel monitoring system which was installed on site by vbi Triscan.

    Tel: 01531 632222   Fax: 01531 634718   Email: sales@lweltd.co.uk Click here to make an Enquiry